• Radically sustainable building materials and architecture.
  • Architecture by Herzog & de Meuron.
  • Certified according to sustainability labels “LEED Platinum”, “SNBS Platinum” and “Minergie A”
  • Part of the Switzerland Innovation Park Basel Area Main Campus.
  • Close proximity to universities and to life science and biotech companies.
  • Botnar Institute of Immune Engineering (BIIE) als Ankermieter.
  • Rental space from 800 m2 for biology or chemistry laboratories and associated offices.
  • Ground floor with lobby, café and working lounge.
  • Direct access to the park.

Designed by leading Basel architectural firm Herzog & de Meuron, the building enables companies to have their laboratories, offices and all other working spaces all together on the same floor . This means that different areas can be brought together in a single location, which is an ideal set-up for new work models.

Just like the neighboring Main Campus HQ and HORTUS buildings, ALL has a radically sustainable design – as well as being climate-neutral, it has a positive impact on people and their environment.

ALL is ready for occupancy from 2027.